Top-down Demolition
In order to safely tear down the defunct Mülheim-Kärlich nuclear power plant, demolition crews installed a remote-controlled excavator machine at its top, which gradually nibbled away until its height was lowered from 531 feet to half its height. The remaining structure was brought down by breaking its supports.